Below is the specification of SIL main equipment:
Steam Field and Steam Above Ground Surface (SAGS) Equipment | 2 set Separator System |
5 km of gathering/injection pipeline (sizes of 36” for steam, 24” for brine, 30” for brine/ condensate) | 1 back-pressure steam turbine (62 MW gross) |
4 Organic Rankine Cycle (ORC, binary cycle) condensing steam units (7 MW gross each) | 2 Organic Rankine Cycle (ORC, binary cycle) geothermal brine units (16 MW gross each) |
The plant is supported by:
- Integrated Geothermal Combined Cycle Units (IGCCU) Technology
- Integrated Control System (ICS – DCS/PLC)
A 150 KV double bus Substation connected to PLN Substation via 2 lines of 2.25 km - 150 KV Transmission Line.